Wednesday, February 20, 2013

Still Avoiding Point Arena

I used my random skein 0f Sheep Shop Yarn Company Sheep 3 yarn (what an incredibly awkward name. It doesn't really abbreviate to anything; Sheep Shop, I guess) to knit a pair of socks.

This is a wool/silk blend and therefore isn't very durable, so these are sleeping socks. Or sit-around-and-watch-tv-while-knitting socks. Lounging socks. Let's go with that. I also made a pair of really uninspired mittens to go with my Kittiwake hat. I considered putting the Kittiwake cables on them, but there are two sets of decrease 4 in there with no matching increase and I couldn't figure out an easy way  to maintain the stitch count and I wanted to finish them up so I could start a new, more exciting pair of mittens. But before I do that, I have to finish reworking Irish Moss. I took it apart and am about 1/3 done with knitting the additional length. With any luck, I'll be able to put it back together this weekend and then I can get back to not working on Point Arena.

No comments:

Post a Comment